We upgraded to 5.5 and all seems good except for the fact that our VC server has been upgraded from 4.x to 5.0,to 5.2, and now to 5.5.
I want to create a new 2012r2 prestine VC server.. I intend to do the following, please tell me if I am missing something and the part I am confused on is how to treat the Cisco nexus 1000v's
1. Create new 2012R2 VM
2. Install Oracle client (We use Oracle doe DB)
3 backup ssl from existing VC server
4. Install VC on new server and configure ODBC to Oracle DB server
5 restore SSL from old server.
6 NOT SURE HOW TO GO ABOUT WITH THE CISCO 1000V